04 — Residential · Dreamland, 6th of October

Dreamland Apartment

Residential design, execution and finishing

Design visual: dining area framed by a timber-and-glass partition
Design visual — not a photograph
Design visual: dining area framed by a timber-and-glass partition

A residential apartment in Dreamland, 6th of October, taken from interior design through execution and finishing.

For this apartment in Dreamland, 6th of October, FORMED provided the full interior design, execution and finishing.

The design is built around warm walnut-toned timber, pale stone and soft concealed lighting, with timber-and-glass partitions that separate living, dining and circulation without closing them off. The material board and site photographs show how the scheme was set out and built: wall and floor tiling, ceiling works and stone details.

Scope of work
  1. 01Full design
  2. 02Execution
  3. 03Finishing
Location
Dreamland, 6th of October
Sector
Residential
Services
Interior Design, Finishing Works
In the images
5 design visuals, 1 material board and 6 site photographs.

Design and build

On site, and the design it is building towards.

The left image is a site photograph; the right is a 3D design visual, not a photograph.

Corridor during strip-out and first-fix works
On site — photographCorridor during strip-out and first-fix works
Design visual: entrance corridor with a backlit mirror and floating timber console
Design visual — not a photographEntrance corridor with a backlit mirror and floating timber console

Chapter 01

Design visuals

3D visuals produced during the design stage, showing the intended result. These are not photographs.

4 images

Entrance corridor with a backlit mirror and floating timber console
Dining table beneath a slatted timber screen
Open living and dining space with warm wall lighting
Media partition in walnut-toned timber dividing living and circulation

Chapter 02

Materials

The palette of finishes chosen for the project.

1 image

Walnut-toned timber, beige marble and painted wall panelling

Chapter 03

On site

Photographs taken on site while the work was under way.

6 images

  1. 03.01Corridor during strip-out and first-fix works
  2. 03.02Ceiling framing and services during construction
  3. 03.03Large-format wall tiling being set out and levelled with laser guides
  4. 03.04Floor tiling set-out with levelling spacers
  5. 03.05Large-format wall panels installed with a recessed floor drain
  6. 03.06Dark marble insert set into a pale stone wall